Wednesday, June 18, 2014

A New York Project



270 GREENWICH STREET, NEW YORK CITY, NY

Utilizing “The Power of the Pump Truck” proved to be a wise decision at 270 Greenwich Street in Manhattan.

Tight finish tolerances on this project made it a challenge to both the Owner and the G.C. to create a high-end, finished product.

Pyramid Floor Covering of Port Washington was hired by the Super Structure contractor to ensure the concrete slabs would be brought into specification at the right elevation.

Curtain wall specification had to meet exact points. Pyramid’s LATICRETE SUPERCAP®specialists are equipped with a Levelmaster system, which enables them to conduct an exact survey prior to the build-out, and ensure that all trades hit the same elevation while keeping the project on time... and, on budget.

  • LOCATION: New York, NY 
  • GENERAL CONTRACTOR: H.R.H. Construction Corp, New York, NY 
  • ARCHITECT: Skidmore, Owens & Merril, New York, NY 
  • FEATURES: 614,500 Square Feet, 38 Floors, 2 Buildings