Pump Truck Technology
- Computer controlled mobile bending unit
- Dual silos (blending is done onsite)
- On board electric generator
- Long arm articulating crane
- Water supply system
- Increased volume – can continuously blend up to 15 tons of material/hour
- Blending is done at street level, no unmixed material enters the building
- Pump material up to 50 stories above ground
Click here for more information.
No comments:
Post a Comment