Tuesday, July 1, 2014

Pump Truck Technology


Pump Truck Technology
  • Computer controlled mobile bending unit
  • Dual silos (blending is done onsite)
  • On board electric generator
  • Long arm articulating crane
  • Water supply system
  • Increased volume – can continuously blend up to 15 tons of material/hour
  • Blending is done at street level, no unmixed material enters the building
  • Pump material up to 50 stories above ground
Click here for more information.

No comments:

Post a Comment