African American History Museum
National Mall, Washington DC
Applicator: East Coast Poured Floors
GC: Clark Construction and Clark Concrete
Project Area: Basement Level – Approx. 20,000 SF
@ 70mm depth (2-1/2”)
Materials: LATICRETE MVC, LATICRETE SUPERCAP
PRIMER PLUS, SC500
Work Scope: Install MVC to entire area, prime
and install three lifts of material in three days with primer installed before
each lift.
Photos taken during second lift shows swirl patterns of 1st lift where smoothing was not needed.