Tuesday, June 10, 2014

St Ignatius Church, Baltimore, MD



East Coast Poured Floors, Inc. was brought in to resolve the many elevation and substrate changes within Baltimore’s St. Ignatius Church, a 100-plus year old house of worship.

LATICRETE SUPERCAP FAST was specified in particular for its quick drying time, low prep and high compressive strength. Approximately 4,000 square feet in the entry rooms, chapel, sacristy, reception and meeting rooms were pumped with LATICRETE SUPERCAP FAST… and, all of these areas were 100% ready for finished flooring goods the very next day!

One truck, two hours and we were done. “This incredible, God-sent system saved the day!” noted one of the clergymen. Once again, East Coast Poured Floors and “The Power of the Pump” teamed up for a successful, high-performance, time and cost-efficient installation.

  • LOCATION: Balitmore, MD
  • GENERAL CONTRACTOR: Hayes Construction, Baltimore, MD
  • INSTALLER: East Coast Poured Floors, Inc, Balitmore, MD
  • FEATURES: 4,000 Square Feet

Monday, June 9, 2014

Single Coat Moisture Vapor Control


LATICRETE SUPERCAP Moisture Vapor Control

Moisture Vapor Control is a single-coat, 100% solids, liquid applied 2-part epoxy coating specifically designed for controlling the moisture vapor emission rate from new or existing concrete slabs prior to installing LATICRETE SUPERCAP underlayment.

  • Can be applied over new concrete in as little as 5 days.
  • Fast cure – ability to apply finish floor goods or LATICRETE SUPERCAP underlayments in as soon as 12 hours.
  • VOC Compliant – UL GREENGUARD GOLD CERTIFIED.
  • Low odor.
  • Easy to use.
  • Compatible with LATICRETE SUPERCAP underlayments as well as non-water based adhesives for hardwood, vinyl, carpet and tile.

Click here to read more.

Friday, June 6, 2014

More GREAT Photos of UHS Hospital in San Antonio, TX




We had such a great response to the first great photo we posted of the LATICRETE SUPERCAP Pump Truck in action on this project. We found some more great photos of this project!

Architect: Perkins & Will 
GC: Vaughn Construction 
GC: Layton Construction
GC: Zachery Construction

Thursday, June 5, 2014

Check Out Our Brochure


Check out the LATICRETE SUPERCAP brochure for concise information in the convenience of a brochure. Great to take to job sites or meetings!

Click here to view and download the brochure.

Wednesday, June 4, 2014

Bravern Project, Bellevue, WA


The LATICRETE SUPERCAP System was chosen by Skanska along with various GCs and flooring contractors at the Bravern site. We were asked to use their expertise and technology to go deep, pour overnight, hit very tight flooring specifications, go from the top down, match all entrance and hallway elevations, all without damaging the finished spaces or interfering with other trades at the site.

The LATICRETE SUPERCAP System was able to shine, using our custom-built Pump Truck/Mobile Blending Unit to pour at record speeds from street level. This allowed the contractors to complete the job prior to the projected deadline, which in turn allowed finished flooring goods to be installed much earlier than if traditional self leveling methods had been utilized. The flooring contractors loved the smooth, hard and flat surface.

  • LOCATION: Seattle, WA 
  • GENERAL CONTRACTOR: Foushee and Associates, Bellevue, WA 
  • ARCHITECT: Perkins Eastman, AIA, New York, NY 
  • FEATURES: 14,000 Square Feet, 3/4” Average Depth

Tuesday, June 3, 2014

A Technical Data Sheet for Every Situation


We have comprehensive Technical Data Sheets for LATICRETE SUPERCAP which can be found here, as well as the many general and specific LATICRETE Technical Data Sheets which can be found here.

Monday, June 2, 2014