Showing posts with label 96. Show all posts
Showing posts with label 96. Show all posts

Friday, May 30, 2014

LATICRETE SUPERCAP System Exceeded Specifications



The LATICRETE SUPERCAP System was chosen by flooring contractor Division 9 for Microsoft buildings 97 & 96. Our challenges included correcting a substrate rainout issue, providing moisture mitigation with Aquafin SG3 and encapsulating the SG3 with LATICRETE SUPERCAP.

We were also asked to achieve a floor flatness requirement of 50. No Problem! The area consisted of 21,000 square feet of moisture-sensitive computer server rooms, which were scheduled to receive Armstrong static-dissipative tile. The Aquafin reduced the MVER to below 1-lb, and we exceeded the floor flatness requirements.

Once again, the LATICRETE SUPERCAP System exceeded specifications and completed the installation four days earlier than if using competing technologies.