African American History Museum
National Mall, Washington DC
Applicator: East Coast Poured Floors
GC: Clark Construction and Clark Concrete
Project Area: Basement Level – Approx. 20,000 SF
@ 70mm depth (2-1/2”)
Materials: LATICRETE MVC, LATICRETE SUPERCAP
PRIMER PLUS, SC500
Work Scope: Install MVC to entire area, prime
and install three lifts of material in three days with primer installed before
each lift.