Wednesday, April 22, 2015

EAST COAST POURED FLOORS MAKING JOB SITE HISTORY IN WASHINGTON, DC!


African American History Museum
National Mall, Washington DC
 
 

Applicator: East Coast Poured Floors

GC: Clark Construction and Clark Concrete

Project Area: Basement Level – Approx. 20,000 SF @ 70mm depth (2-1/2”)

Materials: LATICRETE MVC, LATICRETE SUPERCAP PRIMER PLUS, SC500

Work Scope: Install MVC to entire area, prime and install three lifts of material in three days with primer installed before each lift.
 
Photos taken during second lift shows swirl patterns of 1st lift where smoothing was not needed.